P3.07 · Requires analysis · 2–4 days
Mass KE21N Posting – Costing
Transfers costing-based CO-PA line items in bulk.
What problem does it solve?
Profitability analysis line items are entered one at a time in KE21N; for costing-based postings that means hundreds of lines.
What does it deliver?
Transfers costing-based CO-PA line items in bulk.
A short analysis of your system setup is needed before installation.
Duration and steps
Initial effort is 2–4 days; it is confirmed once we see your system.
-
1 · Preliminary review
We review your system and your need together.
-
2 · Installation
The solution is installed and configured on your system.
-
3 · Test
The results are checked together with you.
-
4 · Go-live
The solution is moved to the live system.
Frequently asked questions
How long does Mass KE21N Posting – Costing take to implement?
Initial effort is 2–4 days. The duration is confirmed based on your system.
Can we buy this solution on its own?
Yes. You do not have to take a whole package; you can select only the solutions you need from the catalog.
How is the price set?
Send us your selection from the catalog; we will come back with a quote and the effort confirmed for your system.

