Sapenta Sapenta

P3.01 · Ready-made program · 2–3 days

710* Actualisation Program

Runs the periodic actualisation postings for 710* accounts with a log.

Get a quote for this solution Full catalog

What problem does it solve?

Period-end actualisation postings for the 710* accounts are prepared and posted manually every month.

What does it deliver?

Runs the periodic actualisation postings for 710* accounts with a log.

It is a ready-made program and is installed on your system quickly.

Duration and steps

Initial effort is 2–3 days; it is confirmed once we see your system.

  1. 1 · Preliminary review

    We review your system and your need together.

  2. 2 · Installation

    The solution is installed and configured on your system.

  3. 3 · Test

    The results are checked together with you.

  4. 4 · Go-live

    The solution is moved to the live system.

Frequently asked questions

How long does 710* Actualisation Program take to implement?

Initial effort is 2–3 days. The duration is confirmed based on your system.

Can we buy this solution on its own?

Yes. You do not have to take a whole package; you can select only the solutions you need from the catalog.

How is the price set?

Send us your selection from the catalog; we will come back with a quote and the effort confirmed for your system.

Other solutions in the same package

P3.02 Automatic KP98 / KP97 Program Runs plan and actual allocation and closing steps in bulk. P3.03 Automatic Standard Price Update Makes the periodic bulk update of standard prices a controlled process. P3.04 Automatic MR22 Program Creates material value difference postings in bulk, with traceability. P3.05 KE27 Automation Program Runs CO-PA valuation and transfer steps automatically each period.

← New Account / Master Data Change NotificationAutomatic KP98 / KP97 Program →