Sapenta Sapenta

P3.08 · Ready-made program · 2–3 days

KB21N Program

Uploads activity allocations in bulk from Excel, with checks.

Get a quote for this solution Full catalog

What problem does it solve?

Activity allocations are entered one by one in KB21N; hundreds of lines are keyed manually at month-end.

What does it deliver?

Uploads activity allocations in bulk from Excel, with checks.

It is a ready-made program and is installed on your system quickly.

Duration and steps

Initial effort is 2–3 days; it is confirmed once we see your system.

  1. 1 · Preliminary review

    We review your system and your need together.

  2. 2 · Installation

    The solution is installed and configured on your system.

  3. 3 · Test

    The results are checked together with you.

  4. 4 · Go-live

    The solution is moved to the live system.

Frequently asked questions

How long does KB21N Program take to implement?

Initial effort is 2–3 days. The duration is confirmed based on your system.

Can we buy this solution on its own?

Yes. You do not have to take a whole package; you can select only the solutions you need from the catalog.

How is the price set?

Send us your selection from the catalog; we will come back with a quote and the effort confirmed for your system.

Other solutions in the same package

P3.01 710* Actualisation Program Runs the periodic actualisation postings for 710* accounts with a log. P3.02 Automatic KP98 / KP97 Program Runs plan and actual allocation and closing steps in bulk. P3.03 Automatic Standard Price Update Makes the periodic bulk update of standard prices a controlled process. P3.04 Automatic MR22 Program Creates material value difference postings in bulk, with traceability.

← Mass KE21N Posting – CostingKB31N Program →