Sapenta Sapenta

P3.03 · Ready-made program · 2–4 days

Automatic Standard Price Update

Makes the periodic bulk update of standard prices a controlled process.

Get a quote for this solution Full catalog

What problem does it solve?

Updating standard prices each period by hand for many materials is slow and error-prone.

What does it deliver?

Makes the periodic bulk update of standard prices a controlled process.

It is a ready-made program and is installed on your system quickly.

Duration and steps

Initial effort is 2–4 days; it is confirmed once we see your system.

  1. 1 · Preliminary review

    We review your system and your need together.

  2. 2 · Installation

    The solution is installed and configured on your system.

  3. 3 · Test

    The results are checked together with you.

  4. 4 · Go-live

    The solution is moved to the live system.

Frequently asked questions

How long does Automatic Standard Price Update take to implement?

Initial effort is 2–4 days. The duration is confirmed based on your system.

Can we buy this solution on its own?

Yes. You do not have to take a whole package; you can select only the solutions you need from the catalog.

How is the price set?

Send us your selection from the catalog; we will come back with a quote and the effort confirmed for your system.

Other solutions in the same package

P3.01 710* Actualisation Program Runs the periodic actualisation postings for 710* accounts with a log. P3.02 Automatic KP98 / KP97 Program Runs plan and actual allocation and closing steps in bulk. P3.04 Automatic MR22 Program Creates material value difference postings in bulk, with traceability. P3.05 KE27 Automation Program Runs CO-PA valuation and transfer steps automatically each period.

← Automatic KP98 / KP97 ProgramAutomatic MR22 Program →