Sapenta Sapenta

P2.06 · Plug and play · 2–3 days

New Account / Master Data Change Notification

Sends automatic notifications for master data changes that affect CO.

Get a quote for this solution Full catalog

What problem does it solve?

If a newly opened account or a changed master record is not maintained on the CO side, the error surfaces at closing.

What does it deliver?

Sends automatic notifications for master data changes that affect CO.

It is a plug-and-play solution, used directly after installation.

Duration and steps

Initial effort is 2–3 days; it is confirmed once we see your system.

  1. 1 · Preliminary review

    We review your system and your need together.

  2. 2 · Installation

    The solution is installed and configured on your system.

  3. 3 · Test

    The results are checked together with you.

  4. 4 · Go-live

    The solution is moved to the live system.

Frequently asked questions

How long does New Account / Master Data Change Notification take to implement?

Initial effort is 2–3 days. The duration is confirmed based on your system.

Can we buy this solution on its own?

Yes. You do not have to take a whole package; you can select only the solutions you need from the catalog.

How is the price set?

Send us your selection from the catalog; we will come back with a quote and the effort confirmed for your system.

Other solutions in the same package

P2.01 CO-PA to Trial Balance Reconciliation Checks the difference between CO-PA and FI balances. P2.02 FI – MM Material Value Comparison Shows the consistency of FI inventory value and MM material value before closing. P2.03 Goods Receipt – Invoice Receipt Check Lists documents that do not match or that create risk. P2.04 Pre-Closing Order Check Shows orders that are open, incorrect or blocking the close.

← Postings to Past Orders Check710* Actualisation Program →