Sapenta Sapenta

P2.04 · Requires analysis · 3–5 days

Pre-Closing Order Check

Shows orders that are open, incorrect or blocking the close.

Get a quote for this solution Full catalog

What problem does it solve?

Orders left open or in an incorrect status stop the WIP, variance and settlement steps at closing.

What does it deliver?

Shows orders that are open, incorrect or blocking the close.

A short analysis of your system setup is needed before installation.

Duration and steps

Initial effort is 3–5 days; it is confirmed once we see your system.

  1. 1 · Preliminary review

    We review your system and your need together.

  2. 2 · Installation

    The solution is installed and configured on your system.

  3. 3 · Test

    The results are checked together with you.

  4. 4 · Go-live

    The solution is moved to the live system.

Frequently asked questions

How long does Pre-Closing Order Check take to implement?

Initial effort is 3–5 days. The duration is confirmed based on your system.

Can we buy this solution on its own?

Yes. You do not have to take a whole package; you can select only the solutions you need from the catalog.

How is the price set?

Send us your selection from the catalog; we will come back with a quote and the effort confirmed for your system.

Other solutions in the same package

P2.01 CO-PA to Trial Balance Reconciliation Checks the difference between CO-PA and FI balances. P2.02 FI – MM Material Value Comparison Shows the consistency of FI inventory value and MM material value before closing. P2.03 Goods Receipt – Invoice Receipt Check Lists documents that do not match or that create risk. P2.05 Postings to Past Orders Check Checks transactions posted later to closed or old orders.

← Goods Receipt – Invoice Receipt CheckPostings to Past Orders Check →