In SAP period-end closing: check first, then close
PMPC is the period-end control and monitoring solution developed by Sapenta. It runs the critical closing checks from one place and finds system errors before the close.
The errors that delay closing are usually noticed during the close
Thousands of postings during the period affect cost. An incorrect or missing posting surfaces when the closing step is run; at that point it is harder and slower to fix.
The close is delayed
When an error is caught at the closing step the process stops; correction and re-runs can take days.
Manual intervention grows
Checks are done with person-dependent lists, one transaction code at a time.
Operational risk grows
An overlooked inconsistency affects reported cost and profitability.
What does PMPC check?
Checks run as defined sets. The main areas:
Cost center and activity
Gaps and inconsistencies in cost center and activity type postings.
Allocation processes
Whether the allocation steps are ready for the close.
Production orders
Production orders in a status that would affect the close.
Settlement and work in process (WIP)
Postings that would block settlement and WIP calculation.
Pre-closing control in four steps
-
1 · Selection
Company code, fiscal year and period are selected.
-
2 · Run
The system runs the defined check sets.
-
3 · Analysis
CO and production processes are scanned.
-
4 · Report
Incorrect postings and data inconsistencies are reported on the cockpit screen.
All checks on one screen
Users manage all checks from a central cockpit screen. Results are tracked by:
- Check code
- Company code
- Fiscal year and posting period
- Version
What does it give the closing team?
- Closing errors are detected early.
- System inconsistencies are resolved before the close.
- Manual checks are reduced.
- The finance team gets central control and reporting.
- Closing becomes faster and more reliable.
Frequently asked questions
What is PMPC?
PMPC (Process Monitoring for Period-End Closing) is the period-end control and monitoring solution Sapenta developed for SAP systems. It runs the critical closing checks centrally and reports errors before the close.
Which areas does PMPC check?
It checks cost center and activity postings, allocation processes, production orders, and the settlement and work in process (WIP) steps.
Does PMPC replace the closing transactions?
No. PMPC is a control and monitoring solution; it shows incorrect postings and inconsistencies before the closing steps are run.
How can we see PMPC on our own system?
Request a demo and we will go through the cockpit screen and the check sets together.

