Sapenta Sapenta

In SAP period-end closing: check first, then close

PMPC is the period-end control and monitoring solution developed by Sapenta. It runs the critical closing checks from one place and finds system errors before the close.

Request a demo Frequently asked questions
Pre-closing check2026 / 11, company code 1000

Checks run

1,460

Errors

7

Warnings

2

Cost center and activity142 checksClean
Allocation18 checksClean
Production orders1,204 checks7 errors
Settlement and work in process (WIP)96 checks2 warnings

Illustrative screen. Figures are examples.

The errors that delay closing are usually noticed during the close

Thousands of postings during the period affect cost. An incorrect or missing posting surfaces when the closing step is run; at that point it is harder and slower to fix.

The close is delayed

When an error is caught at the closing step the process stops; correction and re-runs can take days.

Manual intervention grows

Checks are done with person-dependent lists, one transaction code at a time.

Operational risk grows

An overlooked inconsistency affects reported cost and profitability.

What does PMPC check?

Checks run as defined sets. The main areas:

Cost center and activity

Gaps and inconsistencies in cost center and activity type postings.

Allocation processes

Whether the allocation steps are ready for the close.

Production orders

Production orders in a status that would affect the close.

Settlement and work in process (WIP)

Postings that would block settlement and WIP calculation.

Pre-closing control in four steps

  1. 1 · Selection

    Company code, fiscal year and period are selected.

  2. 2 · Run

    The system runs the defined check sets.

  3. 3 · Analysis

    CO and production processes are scanned.

  4. 4 · Report

    Incorrect postings and data inconsistencies are reported on the cockpit screen.

All checks on one screen

Users manage all checks from a central cockpit screen. Results are tracked by:

  • Check code
  • Company code
  • Fiscal year and posting period
  • Version

What does it give the closing team?

  • Closing errors are detected early.
  • System inconsistencies are resolved before the close.
  • Manual checks are reduced.
  • The finance team gets central control and reporting.
  • Closing becomes faster and more reliable.

Frequently asked questions

What is PMPC?

PMPC (Process Monitoring for Period-End Closing) is the period-end control and monitoring solution Sapenta developed for SAP systems. It runs the critical closing checks centrally and reports errors before the close.

Which areas does PMPC check?

It checks cost center and activity postings, allocation processes, production orders, and the settlement and work in process (WIP) steps.

Does PMPC replace the closing transactions?

No. PMPC is a control and monitoring solution; it shows incorrect postings and inconsistencies before the closing steps are run.

How can we see PMPC on our own system?

Request a demo and we will go through the cockpit screen and the check sets together.

See PMPC with your own data

Write to us for a short demo: info@sapenta.com.tr

Flagship product COGS Statement The Turkish COGS statement, inside SAP Flagship product Sapenta CostTwin See the cost impact before you decide Catalog 36 ready-made CO solutions Select the solutions you need and request a quote.