Sapenta Sapenta

See the cost impact before you decide

Sapenta CostTwin builds a digital twin of your production and cost structure. It calculates production, purchasing and transfer scenarios with SAP material ledger logic, without touching real accounting postings. It is already in use at many customers.

Request a demo Frequently asked questions

Scenario: buying the main input instead of making it

Current production costTRY 1,240 per tonne
Alternative purchase costTRY 1,175 per tonne

The difference

−TRY 65 per tonne

Higher-level products affected

27 products

Illustrative example. Figures are examples.

Production and pricing decisions are often made on estimates

"What if we bought it instead of making it?"

There is usually no fast, reliable answer to this question; the decision is made on intuition or old data.

Transfer scenarios are built outside SAP

Analyses prepared in Excel on rough assumptions do not reflect the real cost structure.

The effect of inflation is noticed late

It is not visible in advance which product's margin will turn negative, and when.

Four core scenarios

Make or buy

Compares production cost with an alternative purchase price, including freight and incidental costs, and shows the effect on higher-level products.

Transfer pricing and group cost

Calculates transfers between plants and companies at cost, cost plus margin, fixed price or market price, including intra-group profit elimination.

Inflation and break-even

Calculates the effect of raw material, energy, labour and exchange rate increases on profitability, and the break-even point.

Multi-level impact analysis

Automatically calculates how a change in one material carries through to every higher-level product that uses it.

Calculation with SAP logic, not an Excel estimate

Simulation in Excel

  • Single material, single level
  • Does not reflect real consumption quantities
  • Does not see the link between lower and higher-level materials
  • Gives an approximate result
  • Updated by hand with every change

Sapenta CostTwin

  • Multi-level, end-to-end material tree
  • Works with real production and consumption data
  • A change at a lower level carries up automatically
  • Auditable results based on SAP material ledger logic
  • Scenarios are saved, compared and reused

Start from the business question

  1. 1 · Scenario type

    A scenario type is selected, such as make-or-buy, transfer pricing or inflation.

  2. 2 · Parameters

    Material, plant, past or current period, alternative price and freight are entered.

  3. 3 · Calculation

    The engine calculates at multiple levels with SAP material ledger logic.

  4. 4 · Result

    The current situation and the scenario are shown side by side; Excel and PDF output is available.

Comparison on one screen

  • Current cost versus alternative cost; unit and total difference
  • All higher-level products affected by the change
  • Effect on inventory valuation and cost of goods sold
  • Change in margin and break-even point
  • Breakdown by plant and profit center

Should the main input be made or bought?

At one of our customers, in-house production of an intermediate product that is the main production input was compared with buying it on the market. A single analysis showed how cost and profitability would change not only for the input but for every product group that uses it.

It also works when SAP's standard processes cannot be activated

Group costing, profit center valuation and transfer pricing are standard SAP processes, but in many companies they cannot be activated, or are only partly used, because of conflicts with custom developments.

  • Produces the same kind of results in a separate layer without touching the existing system setup.
  • Delivers group cost, profit center valuation and transfer pricing output without reconfiguring SAP.
  • Even if the standard process is activated later, it remains as a parallel control and comparison tool.

It does not touch real postings

  • Default use is read-only; nothing is posted to production data.
  • Scenarios are kept in a separate data area with separate authorisation.
  • Control totals are taken before and after calculation.
  • A transaction log and audit trail are kept; scenarios are archived, not deleted.

Frequently asked questions

What is Sapenta CostTwin?

It is a production cost and profitability simulation that runs on SAP material ledger logic. It calculates production, purchasing and transfer scenarios at multiple levels without touching real accounting postings.

Does CostTwin change real SAP postings?

No. Default use is read-only; nothing is posted to production data, and scenarios are kept in a separate data area.

How is it different from a simulation in Excel?

Excel usually calculates a single material at a single level, approximately. CostTwin works with real production and consumption data and carries a change at a lower level up to all higher-level products automatically.

Can calculations be run for past periods?

Yes. Actual period data is used as the basis, and past periods can be recalculated as well.

Group costing or transfer pricing is not active in our system; can we use it?

Yes. CostTwin produces the same kind of results in a separate layer without touching the existing system setup.

See Sapenta CostTwin with your own data

Write to us for a short demo: info@sapenta.com.tr

Flagship product PMPC In SAP period-end closing: check first, then close Flagship product COGS Statement The Turkish COGS statement, inside SAP Catalog 36 ready-made CO solutions Select the solutions you need and request a quote.