Sapenta Sapenta

P6.04 · Service · 3–6 days

Month-End Closing Service

Runs the month-end closing steps under Sapenta's control. Effort is per month.

Get a quote for this solution Full catalog

What problem does it solve?

Month-end closing has many steps in a fixed order; when experienced people leave, steps get skipped or done wrong.

What does it deliver?

Runs the month-end closing steps under Sapenta's control. Effort is per month.

It is delivered as a service; effort is per month.

Duration and steps

Initial effort is 3–6 days; it is confirmed once we see your system.

  1. 1 · Preliminary review

    We review your system and your need together.

  2. 2 · Installation

    The solution is installed and configured on your system.

  3. 3 · Test

    The results are checked together with you.

  4. 4 · Go-live

    The solution is moved to the live system.

Frequently asked questions

How long does Month-End Closing Service take to implement?

Initial effort is 3–6 days. The duration is confirmed based on your system.

Can we buy this solution on its own?

Yes. You do not have to take a whole package; you can select only the solutions you need from the catalog.

How is the price set?

Send us your selection from the catalog; we will come back with a quote and the effort confirmed for your system.

Other solutions in the same package

P6.01 COGS Statement Solution Produces the COGS statement inside SAP, with dynamic configuration tables, instead of in Excel. P6.02 CO Group Costing Solution Manages the consolidated cost and profitability effect of intra-group transfers between company codes. P6.03 Break-Even Analysis Provides break-even, sales volume and profitability analysis based on a fixed and variable cost split. P6.05 Simulated Cost Calculation Program Simulates the effect of price, bill of material or cost component changes before production.

← Break-Even AnalysisSimulated Cost Calculation Program →