Sapenta Sapenta

P1.05 · Ready-made report · 1–2 days

Material Standard Price Check Report

Lists missing or incorrect standard prices as a checklist.

Get a quote for this solution Full catalog

What problem does it solve?

Materials with a missing, zero or incorrect standard price cause large price differences and wrong inventory values at closing, and are often noticed only then.

What does it deliver?

Lists missing or incorrect standard prices as a checklist.

It is a ready-made report and is installed on your system quickly.

Duration and steps

Initial effort is 1–2 days; it is confirmed once we see your system.

  1. 1 · Preliminary review

    We review your system and your need together.

  2. 2 · Installation

    The solution is installed and configured on your system.

  3. 3 · Test

    The results are checked together with you.

  4. 4 · Go-live

    The solution is moved to the live system.

Frequently asked questions

How long does Material Standard Price Check Report take to implement?

Initial effort is 1–2 days. The duration is confirmed based on your system.

Can we buy this solution on its own?

Yes. You do not have to take a whole package; you can select only the solutions you need from the catalog.

How is the price set?

Send us your selection from the catalog; we will come back with a quote and the effort confirmed for your system.

Other solutions in the same package

P1.01 Mass CKM3N Report Displays the actual cost analysis of multiple materials in one run. P1.02 Mass CKMLQS – Inventory Summary Report Shows the cost components of raw materials, semi-finished and finished goods across multiple levels. P1.03 Actual Cost Report by Storage Location Analyses actual cost and inventory values by storage location or plant. P1.04 Standard Price vs Actual Price Comparison Tracks the differences between standard and actual prices by material.

← Standard Price vs Actual Price ComparisonMaterial Plan vs Actual Cost Variance Report →