Sapenta Sapenta

P4.04 · Requires analysis · 3–5 days

Idle Capacity Cost Automation

Separates idle capacity costs automatically.

Get a quote for this solution Full catalog

What problem does it solve?

In periods of under-utilisation, idle capacity costs must be separated from product cost; this is usually calculated in Excel.

What does it deliver?

Separates idle capacity costs automatically.

A short analysis of your system setup is needed before installation.

Duration and steps

Initial effort is 3–5 days; it is confirmed once we see your system.

  1. 1 · Preliminary review

    We review your system and your need together.

  2. 2 · Installation

    The solution is installed and configured on your system.

  3. 3 · Test

    The results are checked together with you.

  4. 4 · Go-live

    The solution is moved to the live system.

Frequently asked questions

How long does Idle Capacity Cost Automation take to implement?

Initial effort is 3–5 days. The duration is confirmed based on your system.

Can we buy this solution on its own?

Yes. You do not have to take a whole package; you can select only the solutions you need from the catalog.

How is the price set?

Send us your selection from the catalog; we will come back with a quote and the effort confirmed for your system.

Other solutions in the same package

P4.01 Plan vs Actual Activity Check on Production Orders Shows the plan versus actual activity variance by production order. P4.02 CPTA – Activity Replication Process and Program Speeds up the bulk replication or distribution of activity values. P4.03 Automatic Loading of Freight Costs to Products Distributes freight costs to product cost systematically. P4.05 Technical Completion of Production Orders (TECO) Runs bulk technical completion of production orders in a controlled way.

← Automatic Loading of Freight Costs to ProductsTechnical Completion of Production Orders (TECO) →