P4.04 · Requires analysis · 3–5 days
Idle Capacity Cost Automation
Separates idle capacity costs automatically.
What problem does it solve?
In periods of under-utilisation, idle capacity costs must be separated from product cost; this is usually calculated in Excel.
What does it deliver?
Separates idle capacity costs automatically.
A short analysis of your system setup is needed before installation.
Duration and steps
Initial effort is 3–5 days; it is confirmed once we see your system.
-
1 · Preliminary review
We review your system and your need together.
-
2 · Installation
The solution is installed and configured on your system.
-
3 · Test
The results are checked together with you.
-
4 · Go-live
The solution is moved to the live system.
Frequently asked questions
How long does Idle Capacity Cost Automation take to implement?
Initial effort is 3–5 days. The duration is confirmed based on your system.
Can we buy this solution on its own?
Yes. You do not have to take a whole package; you can select only the solutions you need from the catalog.
How is the price set?
Send us your selection from the catalog; we will come back with a quote and the effort confirmed for your system.
Other solutions in the same package
← Automatic Loading of Freight Costs to ProductsTechnical Completion of Production Orders (TECO) →

